To request inspections or see the status of your permit, log into your account at kanecounty.cityinspect.com.
Click below for Online Payments for the Building Department
If your application does not meet the requirements set forth in Utah Code Section 17-36-55 (8) (a) through (g) it will be rejected.
Utah Code Section 17-36-55 (8)
Do I need a permit?
The following projects are required to be permitted by Kane County:
When is engineering required in Kane County?
Kane County Building Code
Kane County has adopted the following as their building code:
International Building Code (IBC)
International Residential Code (IRC)
National Electric Code (NEC)
International Plumbing Code (IPC)
International Mechanical Code (IMC)
International Fire Code (IFC)
All other codes as adopted by Utah State Code.
*Building fee appeal process can be found in Utah State Code 17-27A-509.
Utah Chapter of the International Code Council
Ground Snow Load PSF provided by Utah State University.
These buildings will be used for nothing other than agricultural purposes. No power or plumbing will be installed on such buildings.
Appendix C from the 2006 Wildland-Urban Interface Code
If you plan on completing the work on your project yourself this document will be required to be submitted with your application.
This document shows what is acceptable for the Wildfire Mitigation Plan or WUI Plan.
Learn what it takes to make a safe area around your building from wild fires.